Saudi Aramco Vendor ID: 10053108 AR
Our Portfolio

Complete Project Portfolio

Successful projects delivered across industrial sectors

Showing 40 projects

Fire Protection System Design for Industrial Facilities
Fire Protection System Design

12 months

Fire Protection System Design for Industrial Facilities

Industrial facilities face unique safety challenges that require rigorous engineering consultancy and specialized safety engineering solutions. Effective fire...

Saudi Aramco View Details →
Hazardous Area Classification Studies
Process Hazard & Risk Assessment

6 months

Hazardous Area Classification Studies

Detailed classification of hazardous areas according to international standards for safe equipment selection.

SABIC View Details →
Fire Water Demand Calculation
Fire Protection Studies and Reports

3 months

Fire Water Demand Calculation

Hydraulic calculations and sizing of firewater systems to meet facility protection requirements.

Petrochemical Plant View Details →
Fire Risk Assessment
Process Hazard & Risk Assessment

4 months

Fire Risk Assessment

Comprehensive fire risk analysis identifying hazards and recommending mitigation measures.

Oil Refinery View Details →
Fire Alarm & Detection System Studies
Fire Detection and Alarm System Design

5 months

Fire Alarm & Detection System Studies

Design and specification of fire detection and alarm systems for early warning and response.

Gas Processing Plant View Details →
Fire Suppression System Design
Fire Protection System Design

8 months

Fire Suppression System Design

Engineering design of automatic fire suppression systems including foam, water, and gas systems.

Industrial Complex View Details →
Gas Detection System Studies
Fire Detection and Alarm System Design

4 months

Gas Detection System Studies

Toxic and flammable gas detection system design with optimal detector placement and coverage.

Chemical Plant View Details →
Firewater Network Hydraulic Calculations
Fire Protection Studies and Reports

3 months

Firewater Network Hydraulic Calculations

Detailed hydraulic analysis and optimization of firewater distribution networks.

Saudi Aramco View Details →
Fireproofing Studies and Specification
Fire Protection Studies and Reports

6 months

Fireproofing Studies and Specification

Passive fire protection design for structural steel and critical equipment protection.

Offshore Platform View Details →
Fire Protection Specification and Review
Complete Engineering Design Packages

2 months

Fire Protection Specification and Review

Development and review of fire protection specifications ensuring code compliance.

Manufacturing Facility View Details →
Building Risk Assessment (BRA)
Process Hazard & Risk Assessment

5 months

Building Risk Assessment (BRA)

Comprehensive building risk analysis for occupied structures in hazardous facilities.

Petrochemical Complex View Details →
Emergency Escape Route Analysis
Life Safety and Evacuation Plans

3 months

Emergency Escape Route Analysis

Evacuation modeling and escape route optimization for personnel safety.

Oil Terminal View Details →
Emergency Response Planning
Life Safety and Evacuation Plans

6 months

Emergency Response Planning

Development of comprehensive emergency response procedures and training programs.

Gas Plant View Details →
Quantitative Risk Assessment (QRA)
Process Hazard & Risk Assessment

9 months

Quantitative Risk Assessment (QRA)

Detailed quantitative analysis of risks with frequency and consequence modeling.

Refinery Expansion View Details →
Safety Integrity Level (SIL) Assessment
Process Hazard & Risk Assessment

4 months

Safety Integrity Level (SIL) Assessment

SIL determination and verification for safety instrumented systems.

Process Plant View Details →
Hazard and Operability Study (HAZOP)
Process Hazard & Risk Assessment

7 months

Hazard and Operability Study (HAZOP)

Systematic hazard identification and operability review of process systems.

Saudi Aramco View Details →
Preliminary Hazard Analysis (PreHA)
Process Hazard & Risk Assessment

2 months

Preliminary Hazard Analysis (PreHA)

Early-stage hazard identification for project risk management and design input.

New Facility View Details →
Consequence Modeling
Process Hazard & Risk Assessment

5 months

Consequence Modeling

Modeling of fire, explosion, and toxic gas release scenarios for risk assessment.

Chemical Storage View Details →
Security Vulnerability Assessment
Security Systems

4 months

Security Vulnerability Assessment

Comprehensive security assessment identifying vulnerabilities and threats.

Critical Infrastructure View Details →
Security System Design Review
Security Systems

3 months

Security System Design Review

Technical review and optimization of physical security system designs.

Oil Terminal View Details →
Security Risk Assessment
Security Systems

5 months

Security Risk Assessment

Detailed security risk analysis with threat, vulnerability, and consequence evaluation.

Industrial Facility View Details →
CCTV & Access Control System Design
Security Systems

6 months

CCTV & Access Control System Design

Integrated security system design including surveillance and access management.

Saudi Aramco View Details →
Blast Analysis and Mitigation Studies
Process Hazard & Risk Assessment

8 months

Blast Analysis and Mitigation Studies

Explosion impact analysis and blast-resistant design recommendations.

Gas Processing View Details →
SCADA Security Review
Security Systems

4 months

SCADA Security Review

Cybersecurity assessment of industrial control systems and SCADA networks.

Pipeline Operations View Details →
Industrial Cybersecurity Assessment
Security Systems

5 months

Industrial Cybersecurity Assessment

Comprehensive evaluation of OT/IT security vulnerabilities and solutions.

Refinery View Details →
Value Engineering of Safety & Security Systems
Complete Engineering Design Packages

3 months

Value Engineering of Safety & Security Systems

Cost optimization of safety and security designs without compromising effectiveness.

Major Project View Details →
Fire Safety Audit
Fire Protection Studies and Reports

2 months

Fire Safety Audit

Comprehensive audit of existing fire protection systems and procedures.

Operating Facility View Details →
Security Compliance Audit
Security Systems

3 months

Security Compliance Audit

Verification of security systems compliance with regulations and standards.

Oil & Gas Facility View Details →
Incident Investigation and Root Cause Analysis
Process Hazard & Risk Assessment

1 month

Incident Investigation and Root Cause Analysis

Systematic investigation of incidents to identify root causes and prevent recurrence.

Industrial Plant View Details →
Safety & Security Training Programs
Life Safety and Evacuation Plans

Ongoing

Safety & Security Training Programs

Development and delivery of customized safety and security training courses.

Multiple Clients View Details →
Development of Safety Management System (SMS)
Life Safety and Evacuation Plans

10 months

Development of Safety Management System (SMS)

Complete safety management system development tailored to facility needs.

SABIC View Details →
Development of Security Management System (SEMS)
Security Systems

8 months

Development of Security Management System (SEMS)

Comprehensive security management system aligned with international standards.

Critical Facility View Details →
Fire and Gas Mapping Studies
Fire Detection and Alarm System Design

4 months

Fire and Gas Mapping Studies

Optimization of fire and gas detector coverage using advanced mapping techniques.

Offshore Platform View Details →
Safety Procedures Review and Development
Life Safety and Evacuation Plans

5 months

Safety Procedures Review and Development

Development of operational safety procedures and work instructions.

Process Plant View Details →
Third Party Review of Safety Systems
Complete Engineering Design Packages

3 months

Third Party Review of Safety Systems

Independent verification of safety system designs and implementations.

New Project View Details →
Third Party Review of Security Systems
Security Systems

2 months

Third Party Review of Security Systems

Independent assessment of security system effectiveness and compliance.

Government Facility View Details →
Evacuation Planning and Drill Supervision
Life Safety and Evacuation Plans

4 months

Evacuation Planning and Drill Supervision

Emergency evacuation plan development and drill execution supervision.

High-Rise Complex View Details →
Passive and Active Fire Protection Specification
Fire Protection System Design

3 months

Passive and Active Fire Protection Specification

Detailed specifications for comprehensive fire protection systems.

Industrial Project View Details →
Loss Prevention Engineering Services
Complete Engineering Design Packages

6 months

Loss Prevention Engineering Services

Risk-based loss prevention strategies to minimize operational disruptions.

Insurance Client View Details →
Safety & Security Design Validation
Complete Engineering Design Packages

5 months

Safety & Security Design Validation

Validation of integrated safety and security designs against project requirements.

Saudi Aramco View Details →